Jio Odisha
1. NLD- GOVINDPUR-KOCHINDA ORGVNPORKUDASPR001_BU LENGTH 46KM
2. LM- TUKURA I-OR-ATRA-ENB-9038 LENGTH 1.445KM
3. LM- SOHELA-BARAMKELA I-OR-SOLA-ENB-H001 4.105KM
Jio Odisha
Jio route (Ajodhya-gocchasahi)-42kms
Jio route (Parapat rf ajodhya)- 28kms
Laying Optical Fiber Cables in Chhattisgarh (Pithora Block – Ring 1). Scope : 144 kms.
Bharat net PH-ii will provide connectivity to all gram panchayats in the country using an optimal mix of underground fibre, fibre over power lines, radio & satellite media. This is a new element of the bharat net strategy as the mode of connectivity by ariel ofc has several advantages including lower cost and maintainance.
This is a subcontracting project from GSPL Raipur.
Project Financial Overview: Pithora Block : (144kms in 3 months) (By 30th Sep.’20)
Laying Optical Fiber Cables in Chhattisgarh (Bindranawagarh Block – Ring 2). Scope : 110 kms.
This is a subcontracting project from AVA BUILDCON Raipur.
Project Financial Overview: Bindranawagarh Block : (110kms in 3 months) (By 30th Feb 21)
Jio Odisha(FTTH) Rajgangpur Scope : 8kms.
M/s. GALAXY SYNERGY PRIVATE LIMITED, CHHATTISGARH.
- Laying Optical Fiber Cables In Chhattisgarh (Pithora Block-Ring 1)
- Scope: 144 kms
- This Is A Subcontracting Project From GSPL, Raipur.
- Project Financial Overview: Pithora Block: (144kms In 3 Months) (By 30th20)
M/s. AVA BUILDCON,CHHATTISGARH.
- Laying Optical Fiber Cables In Chhattisgarh (Bindranawagarh Block-Ring 2)
- Scope: 119 kms
- This Is A Subcontracting Project From AVA Buildcon, Raipur.
- Project Financial Overview: Bindranawagarh Block: (119 kms In 3 Months) (By 20th20)
M/s. AVA BUILDCON,CHHATTISGARH.
- Laying Optical Fiber Cables In Chhattisgarh (Bindranawagarh Block-Ring 1)
- Scope: 50 kms
- This Is A Subcontracting Project From AVA Buildcon, Raipur.
- Project Financial Overview: Bindranawagarh Block: (50 kms In 3 Months) (By 20th2022)
M/s. STERLITE TECHNOLOGY LTD.
- Laying Optical Fiber Cables In LAHUNIPARA, SUNDARGARH
- Scope: 50 kms
- This Is A Subcontracting Project From, STERLITE TECHNOLOGY LTD.
- Project Financial Overview: LAHUNIPARA (50 kms In 4 Months) (By 20th2022)
Laying Optical Fiber Cables in Chhattisgarh (Bindranawagarh Block – Ring 1). Scope : 48.314kms.
Bharat net PH-ii will provide connectivity to all gram panchayats in the country using an optimal mix of underground fibre, fibre over power lines, radio & satellite media. This is a new element of the bharat net strategy as the mode of connectivity by ariel ofc has several advantages including lower cost and maintainance.
Jio Odisha(Lahunipara). Scope : 55kms.
M/s. AVA BUILDCON,CHHATTISGARH.
- Laying Optical Fiber Cables In Chhattisgarh (Bindranawagarh Block-Ring 3)
- Scope: 50 kms
- This Is A Subcontracting Project From AVA Buildcon, Raipur.
- Project Financial Overview: Bindranawagarh Block: (50kms In 3 Months) (By 30th21)